Analysis on Multi-factorial Risk Coupling Effect of Construction schedule of Large Construction Projects
Authors
Xueliang Hou, Kai Liu
Corresponding Author
Xueliang Hou
Available Online November 2015.
- DOI
- 10.2991/iccet-15.2015.76How to use a DOI?
- Keywords
- Construction Project, Multi-factorial Risk Coupling, Model
- Abstract
This paper aims at researching on multi-factorial risk coupling effect on construction schedule of large construction projects. Combined with related data of construction industry in China and with the means of model and Matlab simulation, the paper has got the effective value of multi-factorial risk coupling . The result shows that personnel is the key factor in multi-factorial risk coupling which leads to project accident and schedule delays. Therefore, paying attention to multi-factorial risk coupling, especially including personnel factor to make early measures can narrow risks down and reduce losses.
- Copyright
- © 2015, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Xueliang Hou AU - Kai Liu PY - 2015/11 DA - 2015/11 TI - Analysis on Multi-factorial Risk Coupling Effect of Construction schedule of Large Construction Projects BT - Proceedings of the 5th International Conference on Civil Engineering and Transportation 2015 PB - Atlantis Press SP - 395 EP - 399 SN - 2352-5401 UR - https://doi.org/10.2991/iccet-15.2015.76 DO - 10.2991/iccet-15.2015.76 ID - Hou2015/11 ER -