Applied research on the improved Great Lakes Calculus Model used in the flood control scheduling of the middle and lower Yangtze river
- DOI
- 10.2991/iccahe-16.2016.20How to use a DOI?
- Keywords
- water control level; flood routing; effect on flood control
- Abstract
This paperÿused the measured data of water level and flow on the cross-sections of middle and lower Yangtze River during flood season (May-September) from 1981 to 2015. According to the evolution of the state of river course, flood and sediment, we calculated the flood routing with the improved Great Lakes flood routing model on the sections of Yichang to Shashi, Shashi to Chenglingji, Chenglingji to Hankou, Hankou to Hukou. And the results of the calculation was checked with the measured data in 1983, 1998,2002 and 2015, to verify the relationship between river and lake and the relevant parameters, and to provide detailed , accurate information for the subsequent models. The calculation results showed that the research was practical , and can be used as the basis of decision.
- Copyright
- © 2016, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Fengming Wan AU - Lihua Long PY - 2016/10 DA - 2016/10 TI - Applied research on the improved Great Lakes Calculus Model used in the flood control scheduling of the middle and lower Yangtze river BT - Proceedings of the 2016 5th International Conference on Civil, Architectural and Hydraulic Engineering (ICCAHE 2016) PB - Atlantis Press SP - 111 EP - 117 SN - 2352-5401 UR - https://doi.org/10.2991/iccahe-16.2016.20 DO - 10.2991/iccahe-16.2016.20 ID - Wan2016/10 ER -