Research on Accurate Algorithm of Construction Project Budget Under Big Data Technology
- DOI
- 10.2991/978-94-6463-030-5_149How to use a DOI?
- Keywords
- Construction Project; Project Budget; Big Data; Improved Sorting Algorithm
- Abstract
With the acceleration of urbanization, the number of construction projects is increasing year by year, and the competitive pressure is also increasing. In order to achieve long-term and reliable development, construction enterprises must adopt modern science and technology to optimize the project management process and standardize the project implementation process so as to ensure that the indicators of construction projects meet the requirements as well as to maximize the interests of enterprises. Based on the analysis of each stage of engineering project management from the perspective of construction life cycle, and on the premise of developing engineering budget management system with big data content of construction engineering, this paper optimizes the dominance decision method to solve the problem of mixed measure decision, and gives a set of definitions related to dominance to improve the method of obtaining dominance. The improved method is analyzed from the characteristics of sorting vector, advantage vector and comparison vector, and its complementarity and consistency are verified, and its effectiveness is proved by an example. The analysis shows that the improved method has a small amount of calculation, high accuracy and a good versatility, and realizes the optimization algorithm that meets the requirements of system operation. It reduces the configuration requirements and computing load of the system background server.
- Copyright
- © 2023 The Author(s)
- Open Access
- Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.
Cite this article
TY - CONF AU - Li Su PY - 2022 DA - 2022/12/20 TI - Research on Accurate Algorithm of Construction Project Budget Under Big Data Technology BT - Proceedings of the 2022 International Conference on Bigdata Blockchain and Economy Management (ICBBEM 2022) PB - Atlantis Press SP - 1493 EP - 1499 SN - 2589-4919 UR - https://doi.org/10.2991/978-94-6463-030-5_149 DO - 10.2991/978-94-6463-030-5_149 ID - Su2022 ER -