The Support for Repairing the Main Roadway in Mine under Complicated Conditions
- DOI
- 10.2991/icadme-15.2015.213How to use a DOI?
- Keywords
- Complicated conditions; Repairing roadway; FLAC Simulation; Monitoring; Leaving in flexible cushion for combined yield supporting
- Abstract
Based on Weijiadi mine No.2 cross-cut West water storage repairing engineering, through on-site investigation, theoretical analysis, FLAC numerical simulation, field tests and monitoring metheds to study The Supporting Technology for Repairing the Main Roadway in Mine under Complicated Conditions, the leaving in flexible cushion for combined yield supporting technology for repairing the main roadway in mine under Complicated Conditions is proposed. Field test and Monitoring showed that bolt-grouting and leaving in flexible cushion for combined yield supporting can give full play to the surrounding rock deformation, and improve the surrounding rock carrying capacity of the joint body, repairing roadway support project is reasonable to good effect.
- Copyright
- © 2015, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Kun Zhang AU - Jianxi Ren AU - Song Wang PY - 2015/10 DA - 2015/10 TI - The Support for Repairing the Main Roadway in Mine under Complicated Conditions BT - Proceedings of the 5th International Conference on Advanced Design and Manufacturing Engineering PB - Atlantis Press SP - 1156 EP - 1163 SN - 2352-5401 UR - https://doi.org/10.2991/icadme-15.2015.213 DO - 10.2991/icadme-15.2015.213 ID - Zhang2015/10 ER -