Proceedings of the 5th International Conference on Advanced Design and Manufacturing Engineering

Study on benefit evaluation system of fair faced concrete construction technique——In Chengdu City 2nd ring road viaduct project as an example

Authors
Li Zhao
Corresponding Author
Li Zhao
Available Online October 2015.
DOI
10.2991/icadme-15.2015.198How to use a DOI?
Keywords
Fair faced concrete; construction technology; Benefit evaluation system
Abstract

This paper introduces the historical research on fair faced concrete, benefit evaluation system of the construction technique of fair faced concrete is studied, and the Chengdu City 2nd ring road viaduct project as an example, analyzes and expounds the construction technology of concrete benefit evaluation system of research results.

Copyright
© 2015, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Download article (PDF)

Volume Title
Proceedings of the 5th International Conference on Advanced Design and Manufacturing Engineering
Series
Advances in Engineering Research
Publication Date
October 2015
ISBN
978-94-6252-113-1
ISSN
2352-5401
DOI
10.2991/icadme-15.2015.198How to use a DOI?
Copyright
© 2015, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Cite this article

TY  - CONF
AU  - Li Zhao
PY  - 2015/10
DA  - 2015/10
TI  - Study on benefit evaluation system of fair faced concrete construction technique——In Chengdu City 2nd ring road viaduct project as an example
BT  - Proceedings of the 5th International Conference on Advanced Design and Manufacturing Engineering
PB  - Atlantis Press
SP  - 1071
EP  - 1074
SN  - 2352-5401
UR  - https://doi.org/10.2991/icadme-15.2015.198
DO  - 10.2991/icadme-15.2015.198
ID  - Zhao2015/10
ER  -