Proceedings of the 2023 9th International Conference on Architectural, Civil and Hydraulic Engineering (ICACHE 2023)

Application of Raise Boring Crossing Technology in Domestic Oil and Gas Pipeline Project

Authors
Shaofei Song1, Hongbo Wang2, Shouye Cheng3, Wanpeng Qi2, Yingquan Li3, Henghao Qin1, Tong Wang4, *
1Wujiang Energy Group Guizhou Natural Gas Pipeline Network Co, LTD, Chongqing, China
2China Petroleum Pipeline Engineering Co, Langfang, China
3Beijing Zhong Coal Mine Mountain Engineering Co., Ltd, Beijing, China
4Hebei GEO University, No. 136 East Huai’an Road, Shijiazhuang, 050031, China
*Corresponding author. Email: 18830122367@139.com
Corresponding Author
Tong Wang
Available Online 30 December 2023.
DOI
10.2991/978-94-6463-336-8_21How to use a DOI?
Keywords
Oil and gas pipeline; Mountain area; Raise boring; Pipe laying
Abstract

In the steep and steep single-sided rocky cliff area, the pipeline can be laid through by using the trenchless crossing method of raise boring, which will change the route selection ideas and principles of the domestic long-distance pipeline industry in the future. Only Saipan Company applied the raised boring crossing technology in Mexico’s natural gas pipeline project for the first time abroad, but it has not been applied in the domestic pipeline industry at present, and the related technologies of pipeline engineering have not been studied. This paper introduces the principle and characteristics of raise boring crossing technology and summarizes the construction difficulties of raise boring in oil and gas pipelines crossing mountainous areas by taking the Zunyi-Suiyang-Zheng a natural gas branch pipeline project as an example, which is also the first successful case of raise boring crossing in China. This paper introduces the application of gas transmission pipeline project raise boring crossing technology for the first time, to provide some reference for the popularization of raise boring pipeline crossing technology in the future.

Copyright
© 2023 The Author(s)
Open Access
Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.

Download article (PDF)

Volume Title
Proceedings of the 2023 9th International Conference on Architectural, Civil and Hydraulic Engineering (ICACHE 2023)
Series
Advances in Engineering Research
Publication Date
30 December 2023
ISBN
978-94-6463-336-8
ISSN
2352-5401
DOI
10.2991/978-94-6463-336-8_21How to use a DOI?
Copyright
© 2023 The Author(s)
Open Access
Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.

Cite this article

TY  - CONF
AU  - Shaofei Song
AU  - Hongbo Wang
AU  - Shouye Cheng
AU  - Wanpeng Qi
AU  - Yingquan Li
AU  - Henghao Qin
AU  - Tong Wang
PY  - 2023
DA  - 2023/12/30
TI  - Application of Raise Boring Crossing Technology in Domestic Oil and Gas Pipeline Project
BT  - Proceedings of the 2023 9th International Conference on Architectural, Civil and Hydraulic Engineering (ICACHE 2023)
PB  - Atlantis Press
SP  - 186
EP  - 198
SN  - 2352-5401
UR  - https://doi.org/10.2991/978-94-6463-336-8_21
DO  - 10.2991/978-94-6463-336-8_21
ID  - Song2023
ER  -