Key Technology of the Prefabricated Pipe Gallery Under-passing the Railway
- DOI
- 10.2991/978-94-6463-336-8_9How to use a DOI?
- Keywords
- prefabricated pipe gallery; expressway; numerical simulation; reinforcement
- Abstract
When the integrated pipe gallery passes through the railway line at a close distance, when the railway line is overhead, the temporary reinforcement system of the line will bear the main load of the continuous operation train, so the stability of the line reinforcement system determines the safety of the railway operation. Based on the project of a prefabricated pipe gallery of the Shenzhen Meiguan expressway corridor through Pingnan railway, this paper uses the finite element numerical analysis method to analyze the stress deformation characteristics of each structure of the reinforcement system under different traffic conditions, to provide a reference for the structural design and construction scheme adjustment of similar projects in the future.
- Copyright
- © 2023 The Author(s)
- Open Access
- Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.
Cite this article
TY - CONF AU - Yue Li AU - Yong Zeng AU - Xinyu Yan PY - 2023 DA - 2023/12/30 TI - Key Technology of the Prefabricated Pipe Gallery Under-passing the Railway BT - Proceedings of the 2023 9th International Conference on Architectural, Civil and Hydraulic Engineering (ICACHE 2023) PB - Atlantis Press SP - 67 EP - 74 SN - 2352-5401 UR - https://doi.org/10.2991/978-94-6463-336-8_9 DO - 10.2991/978-94-6463-336-8_9 ID - Li2023 ER -