Proceedings of the 2015 International Conference on Architectural, Civil and Hydraulics Engineering

The Evaluation of Emergency Response Capability for Metro Construction Based on CUOWA Operator

Authors
Jinxian Zhao, Jinghan Sun, Ke Fan, Min Liu
Corresponding Author
Jinxian Zhao
Available Online November 2015.
DOI
10.2991/icache-15.2015.89How to use a DOI?
Keywords
Metro construction;emergency response capability;index system;OWA operator;evaluation methodology
Abstract

According to the characteristics during construction of the metro incidents,an emergency capability evaluation index system of metro construction was established in the paper,which based on the relevant theory of the ability of emergency management. Build up a metro construction of emergency capability evaluation modelbased on the Combined Uncertain OWA(referred to as the CUOWA) operator ,by using improved analytic hierarchy process (AHP) to determine the index weight.Finally, the evaluation model is applied to the concrete examples,and some suggestions are put forward to strengthen the emergency response capability, which can provide reference for the evaluation of emergency response capability in the metro construction process.

Copyright
© 2015, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Download article (PDF)

Volume Title
Proceedings of the 2015 International Conference on Architectural, Civil and Hydraulics Engineering
Series
Advances in Engineering Research
Publication Date
November 2015
ISBN
978-94-6252-139-1
ISSN
2352-5401
DOI
10.2991/icache-15.2015.89How to use a DOI?
Copyright
© 2015, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Cite this article

TY  - CONF
AU  - Jinxian Zhao
AU  - Jinghan Sun
AU  - Ke Fan
AU  - Min Liu
PY  - 2015/11
DA  - 2015/11
TI  - The Evaluation of Emergency Response Capability for Metro Construction Based on CUOWA Operator
BT  - Proceedings of the 2015 International Conference on Architectural, Civil and Hydraulics Engineering
PB  - Atlantis Press
SP  - 463
EP  - 467
SN  - 2352-5401
UR  - https://doi.org/10.2991/icache-15.2015.89
DO  - 10.2991/icache-15.2015.89
ID  - Zhao2015/11
ER  -