BIM Earthwork Calculation of Open Cut Section of Intercity Railway Based on BIM+GIS technology
- DOI
- 10.2991/978-94-6463-398-6_32How to use a DOI?
- Keywords
- BIM+GIS technology; Intercity railway; Open excavation section; BIM earthwork calculation
- Abstract
To improve accuracy and efficiency, reduce labor intensity and labor costs, this article proposes a earthwork calculation process and method for the open excavation section of the road, which is used to guide the construction of the open excavation section of the road. Based on the research background of the volume calculation of the open cut section of the road in the hilly area of Shenzhen, the basic principle of earthwork volume acquisition is introduced. The concept of BIM+GIS is adopted, and the inclined photogrammetry technology is used to aerial survey the original surface of the open cut section of the road, obtaining a digital surface model (DSM). Using BIM technology to create a roadbed structure building information model, the above two data models are superimposed and fused to obtain a digital engineering model (DEM) for railway roadbed engineering. Then, according to the principle of numerical integration calculation, the volume of the open cut section of the road is quickly obtained. The comparison with traditional methods for obtaining and designing earthwork volume shows that the proposed earthwork calculation method has higher accuracy and faster speed, and can meet the construction needs of road open excavation sections in the hilly terrain environment of Shenzhen area. It has important reference significance for accurately and efficiently obtaining the earthwork volume of road open excavation sections.
- Copyright
- © 2024 The Author(s)
- Open Access
- Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.
Cite this article
TY - CONF AU - Mingliang Pan AU - Hanling Sun PY - 2024 DA - 2024/04/24 TI - BIM Earthwork Calculation of Open Cut Section of Intercity Railway Based on BIM+GIS technology BT - Proceedings of the 2023 5th International Conference on Hydraulic, Civil and Construction Engineering (HCCE 2023) PB - Atlantis Press SP - 322 EP - 329 SN - 2589-4943 UR - https://doi.org/10.2991/978-94-6463-398-6_32 DO - 10.2991/978-94-6463-398-6_32 ID - Pan2024 ER -