Water Hammer Analysis of Hydropower Station with Multi-level Water Intake
- DOI
- 10.2991/978-94-6463-398-6_57How to use a DOI?
- Keywords
- water hammer; hydropower station; multi-level water intakes
- Abstract
It’s special and complicated of water hammer analysis of hydropower station with multi-level water intake.In this paper, water hammer analysis is carried out for a hydropower station with stratified intake.The results show that the project layout and power generation water level meet the operation requirements.In addition, the ventilation hole and the upper pipe are considered as surge chamber to carry out the sensitivity analysis of the surge chamber impedance coefficient. The results show that due to the small area of the vent hole, the calculation results are almost unchanged when it is considered as a surge chamber. However, when the lower intake water to generate electricity, the upper pipeline can be considered as a surge chamber, which has a inhibitory effect on the water hammer.
- Copyright
- © 2024 The Author(s)
- Open Access
- Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.
Cite this article
TY - CONF AU - Hongbo Zhu AU - Jinfeng Wang AU - Shaojia Yang AU - Sheng Zhang AU - Zhixuan Zhang PY - 2024 DA - 2024/04/24 TI - Water Hammer Analysis of Hydropower Station with Multi-level Water Intake BT - Proceedings of the 2023 5th International Conference on Hydraulic, Civil and Construction Engineering (HCCE 2023) PB - Atlantis Press SP - 584 EP - 589 SN - 2589-4943 UR - https://doi.org/10.2991/978-94-6463-398-6_57 DO - 10.2991/978-94-6463-398-6_57 ID - Zhu2024 ER -