Proceedings of the 2023 3rd International Conference on Financial Management and Economic Transition (FMET 2023)

Multidimensional Comparison Method for Overseas Asset Operations of Power Grid Enterprises

Authors
Liyu Xia1, *, Lanjun Xu1, Xin Li1, Wan He1, Dongfang Zhang1
1State Grid Energy Research Institute, Beijing, China
*Corresponding author. Email: xialiyu@sgeri.sgcc.com.cn
Corresponding Author
Liyu Xia
Available Online 15 October 2023.
DOI
10.2991/978-94-6463-272-9_28How to use a DOI?
Keywords
power grid enterprise; overseas assets; indicator management; project comparison; early warning analysis
Abstract

As a new force and vanguard of China’s “going global” strategy, power grid enterprises need to attach great importance to international business development, continuously improve their overseas asset operation capabilities and risk prevention capabilities. Solve the problems of insufficient application of overseas asset operation indicator management, insufficient guidance of indicator system, and insufficient analysis of indicator system. This article proposes a comparative method for overseas asset operation of power grid enterprises and a method for setting operational indicator warning thresholds. In the vertical time dimension, a comparison method combining “operational index and key indicators” is adopted. In terms of horizontal project dimensions, the indicators of each project are mainly described from the perspectives of current value and change rate. In terms of warning function, the indicator warning threshold is determined through two methods: with reference standards and without reference standards.

Copyright
© 2024 The Author(s)
Open Access
Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.

Download article (PDF)

Volume Title
Proceedings of the 2023 3rd International Conference on Financial Management and Economic Transition (FMET 2023)
Series
Advances in Economics, Business and Management Research
Publication Date
15 October 2023
ISBN
978-94-6463-272-9
ISSN
2352-5428
DOI
10.2991/978-94-6463-272-9_28How to use a DOI?
Copyright
© 2024 The Author(s)
Open Access
Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.

Cite this article

TY  - CONF
AU  - Liyu Xia
AU  - Lanjun Xu
AU  - Xin Li
AU  - Wan He
AU  - Dongfang Zhang
PY  - 2023
DA  - 2023/10/15
TI  - Multidimensional Comparison Method for Overseas Asset Operations of Power Grid Enterprises
BT  - Proceedings of the 2023 3rd International Conference on Financial Management and Economic Transition (FMET 2023)
PB  - Atlantis Press
SP  - 253
EP  - 259
SN  - 2352-5428
UR  - https://doi.org/10.2991/978-94-6463-272-9_28
DO  - 10.2991/978-94-6463-272-9_28
ID  - Xia2023
ER  -