Proceedings of the 5th FIRST T1 T2 2021 International Conference (FIRST-T1-T2 2021)

Rapid Transit (BRT) Public Transport Service Corridor I: Alang Lebar to Dempo During the Covid 19 Pandemic in the City of Palembang

Authors
Herlinawati Herlinawati1, Yusri Bermawi1, *, Moch. Absor1, A. Latif1, Muhammad Dimas1, Muhammad Arief M1, Muhammad Geraeldy1, Ibnusyah Alam1
1Department of Civil Engineering, Politeknik Negeri Sriwijaya,Jalan Srijaya Negera Palembang, 30154, Indonesia
*Corresponding author. Email: yusribermawi18@gmail.com
Corresponding Author
Yusri Bermawi
Available Online 14 February 2022.
DOI
10.2991/ahe.k.220205.011How to use a DOI?
Keywords
Bus; Traverser; load factor; vehicle
Abstract

The Palembang city government has implemented Bus Rapid Transit (BRT) since 2010 until now, in order to carry out the replacement/renewal of the City Bus. The BRT in the city of Palembang called “BRT Trans Musi” consists of two business entities, namely BRT owned by BUMD SP2J (Palembang Jaya Development Facilities) and owned by the Ministry of Land Transportation, namely PT. TMPJ (Trans Musi Palembang Jaya). PT. TMPJ operates in Palembang on June 2, 2020, during the “Covid 19 Pandemic” in progress With its relatively recent operation, it is very necessary to conduct a study of BRT services at TMPJ, especially the Alang-Alang Lebar to Dempo corridor in order to be able to continue its operations. The method used in this study is direct traffic observation on the corridors traversed by BRT buses. From data analysis obtained: mean headway = 8 minutes; service time =29 seconds; travel time = 1 hour 56 minutes 15 seconds; operational speed = 20.85 km/hour and load factor = 50.02 %. This load factor if calculated based on the vehicle seat capacity = 0.261 %

Copyright
© 2022 The Authors. Published by Atlantis Press International B.V.
Open Access
This is an open access article under the CC BY-NC license.

Download article (PDF)

Volume Title
Proceedings of the 5th FIRST T1 T2 2021 International Conference (FIRST-T1-T2 2021)
Series
Atlantis Highlights in Engineering
Publication Date
14 February 2022
ISBN
978-94-6239-535-0
ISSN
2589-4943
DOI
10.2991/ahe.k.220205.011How to use a DOI?
Copyright
© 2022 The Authors. Published by Atlantis Press International B.V.
Open Access
This is an open access article under the CC BY-NC license.

Cite this article

TY  - CONF
AU  - Herlinawati Herlinawati
AU  - Yusri Bermawi
AU  - Moch. Absor
AU  - A. Latif
AU  - Muhammad Dimas
AU  - Muhammad Arief M
AU  - Muhammad Geraeldy
AU  - Ibnusyah Alam
PY  - 2022
DA  - 2022/02/14
TI  - Rapid Transit (BRT) Public Transport Service Corridor I: Alang Lebar to Dempo During the Covid 19 Pandemic in the City of Palembang
BT  - Proceedings of the 5th FIRST T1 T2 2021 International Conference (FIRST-T1-T2 2021)
PB  - Atlantis Press
SP  - 59
EP  - 65
SN  - 2589-4943
UR  - https://doi.org/10.2991/ahe.k.220205.011
DO  - 10.2991/ahe.k.220205.011
ID  - Herlinawati2022
ER  -