Managing temporal uncertainty in multi-mode Z-number fuzzy graph structures
- DOI
- 10.2991/eusflat-19.2019.80How to use a DOI?
- Keywords
- Fuzzy graph Temporal uncertainty Decision-making Z-numbers Scheduling Geometrical interpretation Topology Preference matrix
- Abstract
In this paper we introduce an NP-hard optimization problem and examine preferences of decision-maker towards imprecise alternatives (modes) in a fuzzy temporal graph structure model. Fuzzy Z-number preference matrix is introduced and types of generalized precedence relations in fuzzy multimode resource-constrained project scheduling problem (F-MRCPSP) based on expert estimation are discussed. Implementation of Z-numbers allows handling uncertain data and modelling preferences of expert towards uncertain variables. Multi-mode way for activity performance allows considering temporal uncertainty, expert estimations, exibility in switching from mode to mode and resource levelling prole problem. Geometrical interpretation for fuzzy multi-mode problem (F-MRCPSP) based on box packing is given.
- Copyright
- © 2019, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Margarita Knyazeva AU - Alexander Bozhenyuk AU - Uzay Kaymak PY - 2019/08 DA - 2019/08 TI - Managing temporal uncertainty in multi-mode Z-number fuzzy graph structures BT - Proceedings of the 11th Conference of the European Society for Fuzzy Logic and Technology (EUSFLAT 2019) PB - Atlantis Press SP - 580 EP - 587 SN - 2589-6644 UR - https://doi.org/10.2991/eusflat-19.2019.80 DO - 10.2991/eusflat-19.2019.80 ID - Knyazeva2019/08 ER -