Cost Control & Optimization Technique For Sino Iron Project
- DOI
- 10.2991/etmhs-15.2015.59How to use a DOI?
- Keywords
- cost control and optimization; Monte Carlo Method and PERT Network Optimization Technique;
- Abstract
Sino Project has to face to lots of uncontrollable factors from China and Australia which made the cost control be in an passive state as well as be exposed to great risks and difficulty since the commencement. How to effectively and efficiently control the project cost in the reasonable range is the engine to promote the whole project with smooth going. The answer is to monitor and control all kinds of consumption in scientific management to make sure that the project can be operated in lower cost compared with the similar projects in WA. In this paper, we try to research the cost control and optimization by Monte Carlo Method, PERT Network Optimization Technique and other solution to realize the project cost in delicacy management.
- Copyright
- © 2015, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Shijun Song PY - 2015/03 DA - 2015/03 TI - Cost Control & Optimization Technique For Sino Iron Project BT - Proceedings of the 2015 International Conference on Education Technology, Management and Humanities Science PB - Atlantis Press SP - 256 EP - 259 SN - 2352-5398 UR - https://doi.org/10.2991/etmhs-15.2015.59 DO - 10.2991/etmhs-15.2015.59 ID - Song2015/03 ER -