The Analysis of Schedule Control of Construction Project Using AHP Methods
- DOI
- 10.2991/essaeme-17.2017.352How to use a DOI?
- Keywords
- AHP, influence factor, weight coefficient, AHP
- Abstract
The schedule control is a method which keep the tasks, resources and time balanced to achieve project's goal. And with the development of the construction,the time limit for a project control has become more important than ever before. The article uses Analytic Hierarchy Process (AHP) method to find the most important factors, and table some proposals. The article presents 8 indexes of schedule control. This indexes were related to the design or construction:the accuracy of designs, reduce design changes, discussion of drawing,design plan. And in the aspect of the construction, construction preparation, construction plan, construction management and construction goal. Due to the analysis of the indexes, the article draw a conclusion that which indexes were more important than the others. The results of the analysis can be guiding plan. And the article provide the method in schedule control. The results can be successfully adapted in the work.
- Copyright
- © 2017, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Ke Liu PY - 2017/07 DA - 2017/07 TI - The Analysis of Schedule Control of Construction Project Using AHP Methods BT - Proceedings of the 2017 3rd International Conference on Economics, Social Science, Arts, Education and Management Engineering (ESSAEME 2017) PB - Atlantis Press SN - 2352-5398 UR - https://doi.org/10.2991/essaeme-17.2017.352 DO - 10.2991/essaeme-17.2017.352 ID - Liu2017/07 ER -