Schedule Planning Control of Software Project based on PSP
- DOI
- 10.2991/essaeme-16.2016.170How to use a DOI?
- Keywords
- software project management; schedule planning; control process; control method; PSP; personal software process
- Abstract
Favorable planed management is the base of software project succeed. In this piece aim at the present situation of software project management, comprehensive use the thought of software engineering and project management, explore process and method of project schedule planning control. On the base of analysis software project schedule planning control difficulties, research based on PSP method. PSP follow adjustment, practice, measurement, comparison result and readjustment such a circulation and the continuous improvement of process, it is a process step by step for a long time. This paper studies the successful application of content; it can change insufficient plan in software project management process, the phenomenon of control adverse, improve comprehensive management ability and competitive power of project, creating Value for software company, improve high quality service for user.
- Copyright
- © 2016, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Yongchang Ren AU - Chengwei Wu AU - Ying Zhao PY - 2016/08 DA - 2016/08 TI - Schedule Planning Control of Software Project based on PSP BT - Proceedings of the 2016 International Conference on Economics, Social Science, Arts, Education and Management Engineering PB - Atlantis Press SP - 847 EP - 850 SN - 2352-5398 UR - https://doi.org/10.2991/essaeme-16.2016.170 DO - 10.2991/essaeme-16.2016.170 ID - Ren2016/08 ER -