Contradiction Between Electric Power Market-oriented Reform and Sustainable Development: Evidence from China
- DOI
- 10.2991/epee-16.2016.44How to use a DOI?
- Keywords
- market-oriented reform; monopoly profits; regulation failure; 3-phase loop game introduction
- Abstract
In this paper, by constructing a 3-phase pool game, instructions that large industrial electric power direct purchase will leads to price distortion under the condition of imperfect regulation, increase the electricity price cross-subsidy that general industrial and commercial users to large industrial users, there is regulation capture phenomenon with the electricity price structure changes. Concluded that China is now pushing to large industrial users direct purchase as a representation of electric power market reform measures can lead to conflict with sustainable development. It is not only prompted electricity price structure distorted,but also formed monopoly profits of grid enterprise in a new way. Reasonable electricity market reform should be based on the basis of sustainable development.
- Copyright
- © 2016, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Shuo Yin AU - Jing Yan AU - Hongkun Bai AU - Jiangbo Wang AU - Dawei Song AU - Junhui Liu PY - 2016/10 DA - 2016/10 TI - Contradiction Between Electric Power Market-oriented Reform and Sustainable Development: Evidence from China BT - Proceedings of the 2016 International Conference on Energy, Power and Electrical Engineering PB - Atlantis Press SP - 199 EP - 202 SN - 2352-5401 UR - https://doi.org/10.2991/epee-16.2016.44 DO - 10.2991/epee-16.2016.44 ID - Yin2016/10 ER -