Discussion on Several Safety and Stability Problems of Large Receiving-End Power Grid after AC UHV Access
Authors
Guangyao Yu, Tianhao Wang, Guodong Li, Jian Zhang, Zhiqiang Chong
Corresponding Author
Guangyao Yu
Available Online October 2016.
- DOI
- 10.2991/epee-16.2016.25How to use a DOI?
- Keywords
- short-circuit current; reactive power; power transfer
- Abstract
With the UHV power grid into a period of rapid development, bi-coupled electromagnetic loop network or even 1000kV/500kV/220kV tri-coupled electromagnetic loop network will be widely formed by the receiving end after UHV project landing. Changes in the structure and operation characteristics of grid bring challenges to the security and stability operation of power grid. This paper discusses 3 problems which could cause operation faults in aspects of short circuit current, reactive power and voltage stability and power transfer in network respectively, and gives relevant measures and guidance suggestions to adjust risks which UHV brought in Tianjin .
- Copyright
- © 2016, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Guangyao Yu AU - Tianhao Wang AU - Guodong Li AU - Jian Zhang AU - Zhiqiang Chong PY - 2016/10 DA - 2016/10 TI - Discussion on Several Safety and Stability Problems of Large Receiving-End Power Grid after AC UHV Access BT - Proceedings of the 2016 International Conference on Energy, Power and Electrical Engineering PB - Atlantis Press SP - 111 EP - 113 SN - 2352-5401 UR - https://doi.org/10.2991/epee-16.2016.25 DO - 10.2991/epee-16.2016.25 ID - Yu2016/10 ER -