Available Transmission Capacity Considering N-1 Risks
- DOI
- 10.2991/emim-16.2016.296How to use a DOI?
- Keywords
- Available transmission capacity; Optimal Power Flow; Risk; Fault set; Electricity Market
- Abstract
Power available transmission capacity (ATC) is one of the important topics of research in the electricity market. So this paper puts forward an available transmission capacity calculation method considering the risks in electricity market environment. Firstly, establishing a regional available transmission capacity model based on the optimal power flow, using the tracking central locus interior point method to calculate the optimal model, and selecting the contingency reasonably, solving the available transmission capacity under various fault. Secondly, introducing the concept of risk, and putting forward method of the available transmission capacity calculation risk, and then publish the corresponding size of available transmission capacity based on risk. Finally, IEEE-30 bus system was simulated for the proposed method, and the results show that the available transmission capacity considering risks can more reflect the uncertainty of system operation under power market.
- Copyright
- © 2016, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Yurong Wang AU - Jie Yu AU - Weiyi Wang AU - Bike Xue AU - Jian Geng AU - Yonghui Liu PY - 2016/04 DA - 2016/04 TI - Available Transmission Capacity Considering N-1 Risks BT - Proceedings of the 6th International Conference on Electronic, Mechanical, Information and Management Society PB - Atlantis Press SP - 1460 EP - 1463 SN - 2352-538X UR - https://doi.org/10.2991/emim-16.2016.296 DO - 10.2991/emim-16.2016.296 ID - Wang2016/04 ER -