Research on Simulation Evaluation of Goods Out-stock Capability of Strategic Projection Base
Authors
Fubing Peng, Zhenke Li, Weizhong Zhang
Corresponding Author
Fubing Peng
Available Online November 2015.
- DOI
- 10.2991/emeeit-15.2015.27How to use a DOI?
- Keywords
- Strategic Projection Base, Goods Out-stock Capability, Simulation Evaluation.
- Abstract
By analyzing goods out-stock operating process of Strategic Projection Base, this paper created a simulation model based on Extend simulation platform. Take a certain material support task for example, according to run the simulation model and analyze the output, it verified the reliability and applicability of the model, tested and evaluated the out-stock capability, found out the job ‘bottleneck’, put forward the suggestions on improving the out-stock capability, and provided the basis for optimizing the allocation of resources.
- Copyright
- © 2015, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Fubing Peng AU - Zhenke Li AU - Weizhong Zhang PY - 2015/11 DA - 2015/11 TI - Research on Simulation Evaluation of Goods Out-stock Capability of Strategic Projection Base BT - Proceedings of the 2015 International conference on Engineering Management, Engineering Education and Information Technology PB - Atlantis Press SP - 131 EP - 135 SN - 2352-538X UR - https://doi.org/10.2991/emeeit-15.2015.27 DO - 10.2991/emeeit-15.2015.27 ID - Peng2015/11 ER -