Research on Adjustment in Contract Sum Caused by Missing of Preliminaries in BQ for Tendering
- DOI
- 10.2991/emeeit-15.2015.19How to use a DOI?
- Keywords
- BQ for tendering Missing of preliminaries Responsibility of risk; Adjustment conditions; Adjustment method
- Abstract
There is a focus that controversy often appears between both sides of employers and contractors in BQ for tendering during construction. Aim at the problem of adjustment of the missing in BQ for tendering, this paper elaborate from two aspects, including the reason and adjustment method. Through analyzing the reasons to divide responsibility of risk on the basis of Code of bills of quantities and valuation for construction works (GB50500-2013). Based on the above analysis defining the adjustment conditions of the missing in BQ for tendering .In terms of adjustment method, divide preliminaries into three categories. It will provide the theory evidence for both sides of employers and contractors to adjust the agreement during construction.
- Copyright
- © 2015, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Ling Yan AU - Qianxing Ding AU - Min Yan PY - 2015/11 DA - 2015/11 TI - Research on Adjustment in Contract Sum Caused by Missing of Preliminaries in BQ for Tendering BT - Proceedings of the 2015 International conference on Engineering Management, Engineering Education and Information Technology PB - Atlantis Press SP - 90 EP - 93 SN - 2352-538X UR - https://doi.org/10.2991/emeeit-15.2015.19 DO - 10.2991/emeeit-15.2015.19 ID - Yan2015/11 ER -