Technology Research on Traffic Organization of Wuhan Municipal Engineering Projects Under Construction
- DOI
- 10.2991/cmfe-15.2015.120How to use a DOI?
- Keywords
- municipal engineering projects; under construction; traffic organization; traffic impact analysis; Wuhan city.
- Abstract
Present Chinese big cities are facing one common problem that road resources have being occupied by the construction of traffic projects. In order to solve the problems of traffic organization during construction properly, this paper put forward the research content and technical principle of municipal engineering projects traffic organization firstly, then suggest a method of traffic organization for viaduct according to the characteristics of the construction period that is divided into three stages (pipelines reconstruction renovation, substructure construction and superstructure construction), which was applied to Traffic organization scheme for construction period of Wuhan Road in Hankou, and it has achieved desired effect. Refer to traffic organization of Wuhan municipal projects under construction, other types of construction projects can be elevated to organize traffic reasonably and keep city traffic common operation, with the consideration of the project characteristics and the actual situation of traffic during construction.
- Copyright
- © 2015, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Zhiqiang Wang AU - Jin Liu AU - Benyong Zhang AU - Jianzhong Li PY - 2015/07 DA - 2015/07 TI - Technology Research on Traffic Organization of Wuhan Municipal Engineering Projects Under Construction BT - Proceedings of the International Conference on Chemical, Material and Food Engineering PB - Atlantis Press SP - 511 EP - 516 SN - 2352-5401 UR - https://doi.org/10.2991/cmfe-15.2015.120 DO - 10.2991/cmfe-15.2015.120 ID - Wang2015/07 ER -