Steel Production Scheduling Based on Priced Timed Automata
Authors
Lixia Ji
Corresponding Author
Lixia Ji
Available Online April 2015.
- DOI
- 10.2991/cmes-15.2015.95How to use a DOI?
- Keywords
- priced timed automata, steel production, cost-optimal, UPPAAL CORA
- Abstract
Scheduling production of steel is very complex because there are many different types of intricate constraints. This paper proposes a method using priced timed automata(PTA). PTA is the formal description method and it describes the behavior of entities, attributes and constraints. Furthermore, it adds some appropriate guidance to reduce the state space. This method converts the scheduling problem into state reachability analysis. Based on this method, we use price element to minimize the production cost.
- Copyright
- © 2015, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Lixia Ji PY - 2015/04 DA - 2015/04 TI - Steel Production Scheduling Based on Priced Timed Automata BT - Proceedings of the 2nd International Conference on Civil, Materials and Environmental Sciences PB - Atlantis Press SP - 339 EP - 342 SN - 2352-5401 UR - https://doi.org/10.2991/cmes-15.2015.95 DO - 10.2991/cmes-15.2015.95 ID - Ji2015/04 ER -