Modelling and an SS Approach for the Parallel Production Lines Scheduling Problem
Authors
Hui-Zhi Ren, Han Xu
Corresponding Author
Hui-Zhi Ren
Available Online November 2016.
- DOI
- 10.2991/ceis-16.2016.49How to use a DOI?
- Keywords
- parallel machine; scheduling; Scatter Search; integer programming
- Abstract
A special parallel machine scheduling problem is studied and formulated into a mixed integer programming model, considering setup time and time window. A valid inequality is deduced and improved with the setup time consideration. An relaxed IP model with valid inequality can provide a primary cable assignment scheme and lower bound to the scheduling problem. A SS algorithm is proposed to solve the problem. At last, the numerical experiments is carried out which demonstrates that the proposed solution approach is effective and efficient.
- Copyright
- © 2017, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Hui-Zhi Ren AU - Han Xu PY - 2016/11 DA - 2016/11 TI - Modelling and an SS Approach for the Parallel Production Lines Scheduling Problem BT - Proceedings of the 2016 International Conference on Computer Engineering and Information Systems PB - Atlantis Press SP - 250 EP - 254 SN - 2352-538X UR - https://doi.org/10.2991/ceis-16.2016.49 DO - 10.2991/ceis-16.2016.49 ID - Ren2016/11 ER -