Research on design method and production process of the fully dry-connected prefabricated slab
- DOI
- 10.2991/978-94-6463-316-0_9How to use a DOI?
- Keywords
- fully dry connection; prefabricated slab; design method; production process
- Abstract
The design method and production process are presented in this paper for the fully dry-connected prefabricated slab, which consists of lower base slab units, upper cover slab units and connection systems. The cover slab units, the base slab units, and the connection systems form a whole slab that has good continuity and integrity through a dislocated installation method. The shear bolts are pre-buried on the edge of the slabs, and holes are set on the steel beams connected with the slabs, and the dry connection is realized by passing the pre-buried bolts through the holes on the steel beams. Based on the structural characteristics of the fully dry-connected prefabricated slab, this paper proposes a design method for the slab and carries out component design according to the need of a given project. Through the research on the production process of the designed slab, a set of production process suitable for the fully dry-connected prefabricated slab, including “double nut fixing method” and “pre-embedded threaded cylinder method”, was established, so as to make a contribution to the design and application of the slab.
- Copyright
- © 2023 The Author(s)
- Open Access
- Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.
Cite this article
TY - CONF AU - Lan Tao AU - Xinxia Li AU - Baoshuang Ren PY - 2023 DA - 2023/12/14 TI - Research on design method and production process of the fully dry-connected prefabricated slab BT - Proceedings of the 2023 5th International Conference on Civil Engineering, Environment Resources and Energy Materials (CCESEM 2023) PB - Atlantis Press SP - 74 EP - 86 SN - 2352-5401 UR - https://doi.org/10.2991/978-94-6463-316-0_9 DO - 10.2991/978-94-6463-316-0_9 ID - Tao2023 ER -