Finite element analysis of inclined wall construction process of super high-rise core tube
- DOI
- 10.2991/978-94-6463-316-0_11How to use a DOI?
- Keywords
- Super high-rise building; Core tube; Inclined wall; Finite element analysis; Construction process
- Abstract
Xiamen Bailu West Tower is a super high-rise building, its core tube is designed to be retracted synchronously along the height of the peripheral shear wall, and the construction method of the core tube is the integral climbing steel platform formwork system + the formwork support system of the inclined wall of the core tube. In this paper, MIDAS Gen is used to simulate the whole construction process of the core tube inclined wall, analyze the deformation and stress state of each construction stage, and review the bearing capacity of the core tube structure. The simulation analysis shows that the construction scheme is feasible and the construction process is safe and controllable.
- Copyright
- © 2023 The Author(s)
- Open Access
- Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.
Cite this article
TY - CONF AU - Yipeng Zhao AU - Baoshuang Ren AU - Yuanfang Li PY - 2023 DA - 2023/12/14 TI - Finite element analysis of inclined wall construction process of super high-rise core tube BT - Proceedings of the 2023 5th International Conference on Civil Engineering, Environment Resources and Energy Materials (CCESEM 2023) PB - Atlantis Press SP - 96 EP - 105 SN - 2352-5401 UR - https://doi.org/10.2991/978-94-6463-316-0_11 DO - 10.2991/978-94-6463-316-0_11 ID - Zhao2023 ER -