Research on Construction of Integrated Management Platform for Whole Process Engineering Consulting based on BIM Technology -- Taking Urban Rail Transit Project as an Example
- DOI
- 10.2991/bems-19.2019.66How to use a DOI?
- Keywords
- semi-structured interview; whole-process engineering consultation; BIM; urban rail transit project.
- Abstract
With the continuous development of whole-process engineering consulting mode, problems such as information island and information fault make it difficult to give full play to the advantages of whole-process engineering consulting integration and collaborative management of urban rail transit projects. In this paper, using a semi-structured interview process to identify the urban rail transit project engineering consulting BIM integrated management requirements, based on BIM integrated management requirements, to build the urban rail transit project based on BIM technology process engineering consulting integrated management platform, and platform to establish a model and safeguard measures, for the whole process of engineering consulting unit to solve urban rail transit project integration and collaborative management problems to provide the reference.
- Copyright
- © 2019, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Haibo Song AU - Yilin Yin PY - 2019/05 DA - 2019/05 TI - Research on Construction of Integrated Management Platform for Whole Process Engineering Consulting based on BIM Technology -- Taking Urban Rail Transit Project as an Example BT - Proceedings of the 1st International Conference on Business, Economics, Management Science (BEMS 2019) PB - Atlantis Press SP - 373 EP - 380 SN - 2352-5428 UR - https://doi.org/10.2991/bems-19.2019.66 DO - 10.2991/bems-19.2019.66 ID - Song2019/05 ER -