Research on Storage Capacity Design of Binzhou Port LNG Receiving Station
- DOI
- 10.2991/asssd-18.2018.116How to use a DOI?
- Keywords
- Binzhou Port; Liquefied Natural Gas; Receiving Station; Storage Capacity
- Abstract
The completion of Binzhou Port has created conditions for LNG receiving station. The storage capacity and the number of storage tanks in the LNG receiving station are the key parameters of the construction control. After a comparative analysis of the calculation formulas of storage capacity in Europe, Japan and China, the storage capacity of Binzhou Port Receiving Station was calculated basing on the commissioning date of the first phase and the second phase by using the Chinese calculation formula. According to the capacity of four individual tanks, the number of storage tanks is finally obtained, i.e.,3 for the first phase, 5 and 4 for the second phase. It forecasts the construction scale of Binzhou Port LNG Receiving Station and provides the reference scheme.
- Copyright
- © 2018, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Xiujun Nie AU - Qinghui Yuan AU - Xia Zhao AU - Xiuyan Zhang PY - 2018/05 DA - 2018/05 TI - Research on Storage Capacity Design of Binzhou Port LNG Receiving Station BT - Proceedings of the 2018 International Conference on Advances in Social Sciences and Sustainable Development (ASSSD 2018) PB - Atlantis Press SP - 566 EP - 571 SN - 2352-5398 UR - https://doi.org/10.2991/asssd-18.2018.116 DO - 10.2991/asssd-18.2018.116 ID - Nie2018/05 ER -