Proceedings of the 2015 International conference on Applied Science and Engineering Innovation

Forecast for Full Life Cycle of Technical Renovation of Power Grid Based on Support Vector Machine

Authors
Zhuohang Wu, Jiye Yang, Guolong Chen, Changchun Wang, Hao Wu, Qing Gao
Corresponding Author
Zhuohang Wu
Available Online May 2015.
DOI
10.2991/asei-15.2015.126How to use a DOI?
Keywords
distribution network planning; life-cycle costs; cost control; economy
Abstract

Starting from the whole life cycle of the distribution network planning project, overall consideration should be given to the cost at different stages within the projection period distribution network planning project, and the time value of money. At the same time, consideration should also be given to the constraint conditions of the distribution network such as balance and others. Taking the total cost present value and its minimum of the multi-stage planning scheme of the distribution network structure as the objective function, this paper aims to establish the mathematical model of the multi-stage planning of the distribution network, so as to get the optimal planning scheme of the multi-stage planning of the distribution network which enjoys the coordination between reliability and economy.

Copyright
© 2015, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Download article (PDF)

Volume Title
Proceedings of the 2015 International conference on Applied Science and Engineering Innovation
Series
Advances in Engineering Research
Publication Date
May 2015
ISBN
978-94-62520-94-3
ISSN
2352-5401
DOI
10.2991/asei-15.2015.126How to use a DOI?
Copyright
© 2015, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Cite this article

TY  - CONF
AU  - Zhuohang Wu
AU  - Jiye Yang
AU  - Guolong Chen
AU  - Changchun Wang
AU  - Hao Wu
AU  - Qing Gao
PY  - 2015/05
DA  - 2015/05
TI  - Forecast for Full Life Cycle of Technical Renovation of Power Grid Based on Support Vector Machine
BT  - Proceedings of the 2015 International conference on Applied Science and Engineering Innovation
PB  - Atlantis Press
SP  - 671
EP  - 674
SN  - 2352-5401
UR  - https://doi.org/10.2991/asei-15.2015.126
DO  - 10.2991/asei-15.2015.126
ID  - Wu2015/05
ER  -