Forecast for Full Life Cycle of Technical Renovation of Power Grid Based on Support Vector Machine
- DOI
- 10.2991/asei-15.2015.126How to use a DOI?
- Keywords
- distribution network planning; life-cycle costs; cost control; economy
- Abstract
Starting from the whole life cycle of the distribution network planning project, overall consideration should be given to the cost at different stages within the projection period distribution network planning project, and the time value of money. At the same time, consideration should also be given to the constraint conditions of the distribution network such as balance and others. Taking the total cost present value and its minimum of the multi-stage planning scheme of the distribution network structure as the objective function, this paper aims to establish the mathematical model of the multi-stage planning of the distribution network, so as to get the optimal planning scheme of the multi-stage planning of the distribution network which enjoys the coordination between reliability and economy.
- Copyright
- © 2015, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Zhuohang Wu AU - Jiye Yang AU - Guolong Chen AU - Changchun Wang AU - Hao Wu AU - Qing Gao PY - 2015/05 DA - 2015/05 TI - Forecast for Full Life Cycle of Technical Renovation of Power Grid Based on Support Vector Machine BT - Proceedings of the 2015 International conference on Applied Science and Engineering Innovation PB - Atlantis Press SP - 671 EP - 674 SN - 2352-5401 UR - https://doi.org/10.2991/asei-15.2015.126 DO - 10.2991/asei-15.2015.126 ID - Wu2015/05 ER -