- Transmission Lines, Life cycle cost management;LCC model;Monte Carlo simulation;DC load flow analysis
- Abstract
Life Cycle Cost Management is a quantitative analysis method. During the grid operation, load growth causing reduced reliability phenomenon such as some lines overloads, electric power enterprises to re-plan and transformate transmission line to ensure the reliability. In this context, in order to reduce the investment cost of the transformation of the power companies and the loss of power users, the use of life-cycle costs, Monte Carlo simulation and DC load flow analysis to establish development plan optimization model of transmission line, quantitative analysis cost of each stage, seek the minimum LCC cost scheme, ensuring reliability while reducing the unnecessary loss of power grid enterprises and customers, improve economic efficiency, raise the overall level of lean management and scientific decision-making At last, in the numerical example, using IEEE39 node to simulate grid operation, comparing different improved circuit development planning, which proves the feasibility and effectiveness of the method.
- Copyright
- © 2015, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Yan Xu AU - Cheng Chi PY - 2015/06 DA - 2015/06 TI - The Development Planning Scheme of the Transmission Lines Based on LCC BT - Proceedings of the 2015 Asia-Pacific Energy Equipment Engineering Research Conference PB - Atlantis Press SP - 400 EP - 403 SN - 2352-5401 UR - https://doi.org/10.2991/ap3er-15.2015.94 DO - 10.2991/ap3er-15.2015.94 ID - Xu2015/06 ER -