Application of EPC Management Model in Construction of Long-distance Pipeline Project
Authors
Yang An
Corresponding Author
Yang An
Available Online June 2017.
- DOI
- 10.2991/ammee-17.2017.42How to use a DOI?
- Keywords
- Long-distance pipe, EPC model, project construction.
- Abstract
Long-distance pipeline has always played a significant role and kept its basic position in the West-East Gas Transmission and West-East Oil Supply programs in China. If natural gas or petroleum is not supported by pipeline, its transmission will be inevitably more dangerous to some extent. The study in this paper will focus on the macroscopic background and explore the relevant elements of EPC management model, so as to put forward the strategy for its application in the construction of long-distance pipeline project.
- Copyright
- © 2017, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Yang An PY - 2017/06 DA - 2017/06 TI - Application of EPC Management Model in Construction of Long-distance Pipeline Project BT - Proceedings of the Advances in Materials, Machinery, Electrical Engineering (AMMEE 2017) PB - Atlantis Press SP - 202 EP - 207 SN - 2352-5401 UR - https://doi.org/10.2991/ammee-17.2017.42 DO - 10.2991/ammee-17.2017.42 ID - An2017/06 ER -