Study on the Influence of Wind Power and Photovoltaic Access to Battery Energy Storage System on Optimized Configuration Benefits
- DOI
- 10.2991/ammee-17.2017.20How to use a DOI?
- Keywords
- Battery energy storage system, Distribution Company, Economic benefit, Wind power, Photovoltaic.
- Abstract
This paper presents a hierarchical planning method for battery energy storage system (BESS) operator and the distribution company (DISCO) collaborative planning in the distribution network with application scenarios that BESS operator invests the constructions of BESS. The charge and discharge contract price is chosen as the optimization variable, in order to achieve the optimizing scheduling of BESS. This paper uses the improved particle swarm optimizer method and introduces Cauchy- Gaussian reduction mutation factor to adjust the local optimal extremum. An improved IEEE-33 nodes system is taken as an example. Cases analysis shows that the method allows both DISCO and BESS operators to be profitable. The simulation results show that when equal capacity DG access to the model, the access of wind power is more effective than the access of photovoltaic, whose benefit is more prominent.
- Copyright
- © 2017, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Yicong Liu AU - Zongqi Liu PY - 2017/06 DA - 2017/06 TI - Study on the Influence of Wind Power and Photovoltaic Access to Battery Energy Storage System on Optimized Configuration Benefits BT - Proceedings of the Advances in Materials, Machinery, Electrical Engineering (AMMEE 2017) PB - Atlantis Press SP - 100 EP - 104 SN - 2352-5401 UR - https://doi.org/10.2991/ammee-17.2017.20 DO - 10.2991/ammee-17.2017.20 ID - Liu2017/06 ER -