Research on Optimum Design of perforation scheme for horizontal well
- DOI
- 10.2991/aeecs-18.2018.5How to use a DOI?
- Keywords
- horizontal well; water flooded layer interpretation;perforation section; optimum design
- Abstract
In the extra high water cut stage, the remaining oil mainly exists in the channel sand body, and the low and non watered thickness of the reservoirs with poor utilization is mainly distributed in the top of the thick oil layer and the variation zone in the layer. The horizontal well is drilled, the horizontal trajectory does not guarantee that all in the remaining oil in the region, so in the concrete establishment should be based on the actual position of perforating drilling trajectory in the reservoir, combining with the lithology and water flooded layer interpretation results and the latter measures to adjust the requirements, application of new techniques of perforation optimization scheme, which can control the initial water content, and can ensure higher capacity requirements, using horizontal well succeeded in tapping the potential of remaining oil at the top of thick oil layer, better development effect.
- Copyright
- © 2018, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - XueBin Han PY - 2018/03 DA - 2018/03 TI - Research on Optimum Design of perforation scheme for horizontal well BT - Proceedings of the 2018 2nd International Conference on Advances in Energy, Environment and Chemical Science (AEECS 2018) PB - Atlantis Press SP - 20 EP - 23 SN - 2352-5401 UR - https://doi.org/10.2991/aeecs-18.2018.5 DO - 10.2991/aeecs-18.2018.5 ID - Han2018/03 ER -